Coordination with the client and fabricator for the delivery, installation, and final approval of the completed work marks the activities in this phase of work. This phase includes careful preparation to transport the work, repair damaged pieces that result from transport, install built-in elements, carefully place furniture throughout a space, and provide a schedule for the client for proper care and maintenance of the completed work. A suite of furnishings
that includes case goods and casework can take several days to transport, deliver, and install. Delivery and installation is an important phase of work that needs to be carefully planned and included in the overall cost of fabricating the work (Figure 6.66).